I final drilled the right wing skins to the structure. With both leading edges clecoed together in their jigs I did not even have enough 3/32 clecos to completely cleco the right wing. I placed an order for another 300 clecos with Aircraft Spruce as I figured Avery and Van's both might be delayed in shipping since Oshkosh begins in a few days.