I temporarily installed tthe battery cables I ordered from B&C to make sure the lengths would work. I ordered a 15" positive and 10" ground cable. I could have gone shorter on the ground cable, but I wanted to make sure my ground block was mounted high enough on the firewall to not interfere with the installation and removal of the battery. I installed the oil and fuel transducers and connected the oil line to the AN fitting on the transducer manifold. I then installed an Adel clamp next to the heat vent box that will hold the breather tube. I began to fabricate the copper bar that will connect the starter contactor to the ANL current limiter. It was cold as heck today, so I called it quits for the evening.