KitLog pro

Powered By Kitlog Pro v2.0

CON'S WEB SITE
' style=
Date:  10-13-2013
Number of Hours:  8.50
Manual Reference:  8-3
Brief Description:  More Bulkhead Preparation

It's been a longer break than I intended. We went to the Southeast Aviation Expo in Greenville, SC and spent a few days knocking out 47 of the 59 airports required for the Ambassador Program. When we got back, I forced myself to stay out of the garage and finish the continuing education classes I needed to maintain my insurance license (don't use it, but really don't want to take that exam again!).

I think that I now have all of the bulkhead parts ready for priming. Hopefully, the weather will be good this Saturday and I can get them all done. In the meantime, the manual says that longeron bending is next on the list. I think that I will do a little research and make sure that I have a good idea of what I need to do prior to getting started.
' style=

Trimming F711A and F711B

Trimming F711A and F711B

' style=

F711A, B, and C Clecoed

F711A, B, and C Clecoed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.