Brief Description: More F-704 Bulkhead Construction
As predicted, I could't resist spending a few more minutes polishing out the F-633 Control Mount cutouts. I want to prime them before mounting them to the F-704B bulkhead and fitting the control column and control stick bases. I drilled out the F-782B L&R and F-783B L&R Cover Support Ribs for the three sizes of snap bushings. I edge-fiinished the ribs as well and they are now ready to prime with the mounts. I began drilling the F-704B Bulkhead for the K1000-08 platenuts and countersunk the rivet holes slightly with a deburring tool in preparation for the NASD "oops" rivets.