Brief Description: Rolled Leading Edge of Left Elevator
I really hate to roll leading edges. I would rather flute, flange, debur, prime or anything else other than rolling these edges. Once again I chose to double the number of blind rivets in nearly every section of the leading edge. I got the rod end bearings installed and measured the specified distance at 13/16". I am waiting on my order of MK319BS from Van's so I can finish the left elevator.