KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 Build Log
' style=
Date:  7-26-2015
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Instrument Panel Installation

Installed the new instrument sub panel and panel in the airframe. Attached the new avionic brackets using .25" instrument screws to the nut plates. Installed the GMA 240 audio panel, GTR 200 transceiver, GPS 496 and GMC 305 into the avionic stack to ensure fitting.

Installed the circuit breakers, (15) total across the bottom of the main panel.

Installed the fresh air eye ball vent

Installed the FPS flap switch.
' style=

New instrument Panel installed

New instrument Panel installed

' style=

New avionic Brackets

New avionic Brackets

' style=

Starting to put stuff into the new panel !!!

Starting to put stuff into the new panel !!!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.