Powered By Kitlog Pro v2.0
My RV-8 Build Log
RV-8
Paint and Prep
7-21-2015
< Previous Log Entry
Next Log Entry >
Date:
7-21-2015
Number of Hours:
2.00
Manual Reference:
Brief Description:
Prime Instrument Panel
Proceeded with attaching the nut plates for the ELT Indicator/Switch since the rivets will be visible on the sub panel.
Cleaned the instrument panel and sub panel with acetone.
Primed the panel and sub panels with good old rustoleum.
From TSC
Panel Primed
ELT Indicator/Switch nut plates iriveted.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
876
2687
Ailerons and Flaps
1
5
Avionics
61
194
Baggage Door
1
3
Brake System
17
34
Cabin
7
40
Canopy
44
138
Cowl
56
180
DAR Inspection
1
3
Electrical
97
275
Empennage
97
342
Engine
122
322
Fairings
54
153
First Flight
1
2
Flight Control
17
46
Flight Training
2
10
Fuel System
34
106
Fuselage
98
299
Instrument Panel
17
60
Interior
13
42
Landing Gear
8
18
Lighting
10
26
Markings, Placards a
2
4
Miscellaneous
14
66
None
1
Paint and Prep
8
24
Phase I
1
2
Pitot/AOA
2
6
Post DAR Inspection
3
14
Prop
15
46
QB Kit
2
9
Static Pressure Syst
4
10
Tech Councilor Visit
1
2
Tech Inspection
1
2
Tires
1
1
Transition Training
1
10
Weight and Balance
1
3
Windscreen
27
75
Wings
34
115
Copyright © 2001-2024 Matronics. All Rights Reserved.