KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 Build Log
' style=
Date:  1-17-2016
Number of Hours:  3.00
Manual Reference:  Off Plan
Brief Description:  Baggage Door # 3 - Custom Aft Rib

Final matched drilled #30 the holes in the new aft rib in common with the doubler plate. Deburred all holes and dimpled for AN426AD4-4 rivets. Back riveted the rivets. The rib is quite strong. The un-intended consequence is the rib is now ~ 1/4" too short to meet the bottom bracket.

I'll need to extend the rib a bit with another doubler to ensure the aft rib can be riveted to the bottom bracket.
' style=

Aft Rib Clecoed in place

Aft Rib Clecoed in place

' style=

Aft Rib Clecoed

Aft Rib Clecoed

' style=

Aft Rib on the new door skin, to short now...

Aft Rib on the new door skin, to short now...

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.