KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 Build Log
' style=
Date:  6-2-2012
Number of Hours:  3.00
Manual Reference:  84
Brief Description:  Instrument Sub Panel

Assembled the instrument sub panel...

Counterskink the #40 holes for the K1000-8 platenuts in the left and right sub panel
Final Drill #19 all holes for the AN8R8 screws to attach the main panel to the sub panel
Rivet the nut plates on to the sub panel forward side.
Rivet the panel flange to the left and right subpanels , leaving the top 8 holes open to allow for installation of subpanel in fuse.
Rivet the left and right attach clips to the left and right sub panel.
Installed the subpanlel in the fuse.
Clecoed the left and right panel clips to the left and right fuse
Clecoed the top open holds of the left and right sub panel.
' style=

Installing the K1000-8 plate nuts (nut plates?)

Installing the K1000-8 plate nuts (nut plates?)

' style=

Cleco the panel attach flange, then rivet, leaving the top 8 holes open

Cleco the panel attach flange, then rivet, leaving the top 8 holes open

' style=

Install the subpanel in the fuse, cleco the attach clips to the left and right fuse

Install the subpanel in the fuse, cleco the attach clips to the left and right fuse

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.