Counterskink the #40 holes for the K1000-8 platenuts in the left and right sub panel Final Drill #19 all holes for the AN8R8 screws to attach the main panel to the sub panel Rivet the nut plates on to the sub panel forward side. Rivet the panel flange to the left and right subpanels , leaving the top 8 holes open to allow for installation of subpanel in fuse. Rivet the left and right attach clips to the left and right sub panel. Installed the subpanlel in the fuse. Clecoed the left and right panel clips to the left and right fuse Clecoed the top open holds of the left and right sub panel.
Installing the K1000-8 plate nuts (nut plates?)
Cleco the panel attach flange, then rivet, leaving the top 8 holes open
Install the subpanel in the fuse, cleco the attach clips to the left and right fuse