KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 Build Log
' style=
Date:  11-16-2011
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Trying my new bending tool

First attempt at bending tubing. First attempt for the vent line from the right tank. It's actually a bit too long, so I will make another, but pretty happy with a first attempt.

I am short one of the 90 degree fuel line fittings for some reason... $6.90 from A-S. How many times have I ordered something from A-S - lost count !! But I have all the receipts.

The vent line as installed is a bit too tall, meaning it needs to be secure to the top of the gear leg, but not touch the top of the gear leg tower... this one does, so I will just pull it out and re-bend it to fit, which will give me the correct dimensions for the 'real' vent lines.
' style=

Fuel valve and connectors

Fuel valve and connectors

' style=

vent line installed - 1st try

vent line installed - 1st try

' style=

vent line - sort of an experiment.

vent line - sort of an experiment.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.