KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 Build Log
' style=
Date:  8-15-2016
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Forward Baggage Compartment

Installed the nut plates for the forward baggage floor. Because of the airframe structure, it was not possible to use one of my two hand squeezers, nor the pneumatic squeezer. so I took my largest channel; lock and grinded the tip smooth. I use the custom channel lock to set the AD426 rivets flush with the airframe structure.

Fitted the forward baggage floor after installing all nut plates.
' style=

Installing nut plates for forward baggage floor

Installing nut plates for forward baggage floor

' style=

Channel Lock Custom Rivet Squeezer

Channel Lock Custom Rivet Squeezer

' style=

Forward Baggage Floor

Forward Baggage Floor

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.