KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 Build Log
' style=
Date:  9-19-2017
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Empennage Fairing - Match Drilling

Located the PP holes in the HS and VS, then matched drilled staring with #40 the empennage fairing to the HS and VS. Followed by drilling #30, then 9/64" for the AN507 screws used to attach the fairing to the HS and VS via platenuts to be riveted after the HS and VS is removed for prime/paint.
' style=

Fairing in Place ready for Match Drilling

Fairing in Place ready for Match Drilling

' style=

Fairing Matched Drill #40 to HS for starters

Fairing Matched Drill #40 to HS for starters

' style=

Fairing Match Drilled 9/64

Fairing Match Drilled 9/64" for AN screws

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.