KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 Build Log
' style=
Date:  8-3-2016
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Forward Baggage Floor Supports

While waiting for new fuel and oil lines to arrive from Tom at TS Flightlines, proceeded with fitting the forward baggage floor. I've put this off because I've spent much time using the baggage door opening to access the aft firewall and related areas.

The floor is powder coated several years ago, it's been quite a while since I've done a 4y primary metal work, if is nice to fire up the compressor and do some measure and trimming, drilling, deburring and dimpling as needed to trim the baggage floor supports, and attach them after final drilling for AN426-3.5 rivets after dimpling the floor and supports.
' style=

Trimming and Fitting

Trimming and Fitting

' style=

Support Angles Cut and Ready for attatchment

Support Angles Cut and Ready for attatchment

' style=

Bottom Side of the Forward Baggage Floor with support angles

Bottom Side of the Forward Baggage Floor with support angles

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.