KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 Build Log
' style=
Date:  5-11-2016
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Lower Cowl to FAB Intake

More sanding on the lower cowl air intake to smooth up the intake. It's good enough until I work on the cowl for finish work. Started working on the connection between the FAB and the lower cowl. The main idea is to use air seal material from the engine baffle to create a tight and smooth fit from the lower cowl intake to the FAB.

Measured and cut the air seal material in two lengths, and located on the FAB.
' style=

Lower Cowl AIr Intake - more sanding to smooth out

Lower Cowl AIr Intake - more sanding to smooth out

' style=

FAB and air seal material cut to size and located.

FAB and air seal material cut to size and located.

' style=

More sanding required

More sanding required

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.