KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 Build Log
' style=
Date:  12-3-2018
Number of Hours:  2.00
Manual Reference:  
Brief Description:  More HS and VS Fairing Work

The HS tip fairings are ready for trimming after fitting to the end of the HS. Marked the aft trim line to get a nice straight line and clear the elevator counter balance tip. I will use balsa to create a cap for the open end, placed about ¼” inside the fiberglass tip, then epoxy the exterior to create a concave shape enabling clearance of the elevator counter balance tip.

For the VS/HS intersection fairing, I removed by sanding the epoxy from the previous VS//HS fitting, which separated the fairing at the leading edge for about 6” where in common with the HS. Re-installed the fairing, then applied more epoxy and glass cloth and let set overnight.

After setting, removed the fairing and began filling and sanding to get a nice smooth finish for the intersection of the HS and VS. There is a bit more work needed where the fairing overlaps the front edge of the HS, but otherwise the fit is much improved and now flush with the fuse.
' style=

HS Fairing clecoed in place

HS Fairing clecoed in place

' style=

HS/VS Fairing right side

HS/VS Fairing right side

' style=

HS/VS Fairing left side

HS/VS Fairing left side

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.