KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 Build Log
' style=
Date:  6-6-2018
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Fairings - will it ever stop !

Epoxied the trailing edge of the aft wheel pant intersection fairing, clamped tight to ensure good adhesion. Applied a mixture of West 105/205 at 50/50 with Acetone to the VS/HS/Fuse fairing, let setup and sanded smooth to provide a measure of protection and acceptable surface for prime and paint, especially to the areas modified to fit the H.S
' style=

Just some epoxy work

Just some epoxy work

' style=

Filling low spots

Filling low spots

' style=

HS fairing after West 105/205 & Acetone at 50/50

HS fairing after West 105/205 & Acetone at 50/50

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.