KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 Build Log
' style=
Date:  1-20-2018
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Relocating IBBS Master and ALT Power

Planning on 2020, ABS-B Out, the solution will be the GPS20A from Garmin which works with the G3X system and the GDL39R for ADS-B In solution. Removed the 10-amp circuit break on the avionics bus used for the IBBS backup battery, instead wired the battery to a 10-amp SWB on the Main Bus. I had previously located the IBBS Backup Power Switch here, though it was not connected to the main bus, it closed to ground to activate the backup battery.
Moved the switch to the panel above the ignition switch and added a switch for the always-on bus, so, well I can turn it off.
' style=

Relocting the IBBS Master Switch and Other THINGS

Relocting the IBBS Master Switch and Other THINGS

' style=

IBBS Backup Power and Always On Bus

IBBS Backup Power and Always On Bus

' style=

Aft side of Panel New Switches

Aft side of Panel New Switches

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.