KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 Build Log
' style=
Date:  10-11-2017
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Emp Fiberglass Finishing, Platenut Prep

A lot of small things to do with the empennage at this point. Used a mixture of epoxy and microballons to fill the gaps between the elevator fairing and skin, let set up and started sanding. Removed the VS and Rudder, the VS needs holes drilled for plate nuts used to attach the fairing for the VS in common with the HS. Holes drilled for plate nuts, then countersunk for flush rivets.
' style=

FIlling and Sanding Elevator Fairing

FIlling and Sanding Elevator Fairing

' style=

VS and Rudder removed

VS and Rudder removed

' style=

Dilling and Countersinking for platenuts in HS

Dilling and Countersinking for platenuts in HS

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.