|
|
My RV-8 Build Log
|
Date: 1-11-2017
|
Number of Hours: 2.00
|
Manual Reference:
|
Brief Description: GDU 460, IBBS Reinstallation
|
|
Finally got all the avionic components reinstalled in the panel after many months of storage while I worked on the front windscreen fairing. Moved on to the components located under the right-side console, the IBBS and ADS-B receiver. The connector for the IBBS was more difficult than anticipated, the alignment tabs are difficult to see, so attaching the connector required a lot of extra light, and a mirror to make sure it was aligned, otherwise just twisting the connector in the hope of landing on the right spot, just did not want to work.
Once connected, there's still a bit of wiggle in the connector, which seems undesirable, and I'm not too sure why this is, but is certainly connected the only way it will align to the battery.
|
|
GDU 460 ready to re-install
|
|
Finally togeter again after many months
|
|
IBBS Plus is being difficult
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |