KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 Build Log
' style=
Date:  9-29-2015
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Flap Position System

Time to work on the ShowPlanes Flap Position System since it is time to finish the wiring.

• Fitted the FPS to the flap motor assembly per instructions for a RV8.
• Marked the left rear console panel to enlarge the hole where the flap motor actuator rod passes through to the attach bracket.
• Enlarged the pass through opening using snips and completed with a file to smooth the edges.
• Tested the flap motor actuator to ensure it passes through the enlarged opening.
' style=

Flap Position System fitting to Flap Motor

Flap Position System fitting to Flap Motor

' style=

Installed

Installed

' style=

lower view

lower view

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.