KitLog pro

Powered By Kitlog Pro v2.0

Bill's Glasair Odyssey
' style=
Date:  1-9-2008
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Powder Coat Control Tubing

Finally back to work! I lot of travel at the end of the year and my annual inspection on my Eagle have kept me away from this project. I took all the controls out of the wing and powder coated all of the steel parts except the elevator control sleeve which I still need to modify per an addendum. All parts were done in gloss white using my Eastwood home powder coating kit. The time includes about 30 minutes of re-sandblasting the tubing yesterday.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.