KitLog pro

Powered By Kitlog Pro v2.0

Bill's Glasair Odyssey
' style=
Date:  12-30-2008
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Gear Door #1 Fabrication

Sanded bevels into core. Q-Celled foam to seal it in prep for layups. Layed up 2 plys over the core and put back into position on the wing fixture to cure. I placed a piece of MDF over the layup and core and weighted the door into position with sandbags.

I also prepped the RH door core by beveling and sealing with q-cells
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.