Sanded bevels into core. Q-Celled foam to seal it in prep for layups. Layed up 2 plys over the core and put back into position on the wing fixture to cure. I placed a piece of MDF over the layup and core and weighted the door into position with sandbags.
I also prepped the RH door core by beveling and sealing with q-cells