Sand blasted control hardware tubing. All of this tubing will be powder coated white. I also ordered some new tubing for the flap torque tubes. These would require redrilling for the electric flap installation meaning lots of extra holes. I have decided to start fresh. I worked on the computer laying out an aluminum elevator horn spacer block per one of the addendums. I am considering welding in gusset plates instead.