Added two plys in the morning and two more plys in the evening. That is a total of nine plys. Two more than I anticipated. The wing skin is now built up to the level of the spacer. Tomorrow morning I will start the first round of the actual flange layups. My plan is to do three plys at a time meaning I should be done with the lower flange layups on Sunday morning.