KitLog pro

Powered By Kitlog Pro v2.0

Bill's Glasair Odyssey
' style=
Date:  11-25-2008
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Reassembled Main Gear, Resealed Actuator

Reassembled the two main gear legs after performing S/B161. The struts were filled with 5606 hydraulic fluid (520 cc each) and pressurized to 90 psi. I then bolted the main gear back into the wing. I resealed the LH main gear actuator. I will need more seals to do the other two. I am doing a final check on the main gear alignment prior to wing close. Every thing looks good so far. I need to final adjust the actuator piston rod lengths, mark the upper wing skins and releive them locally around the tires and the actuators.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.