KitLog pro

Powered By Kitlog Pro v2.0

Bill's Glasair Odyssey
' style=
Date:  11-21-2007
Number of Hours:  1.25
Manual Reference:  
Brief Description:  Drilled Flap Torque Tube

Used the mill at work to drill the holes through the flap center actuator sleeve and the two flap torque tubes. I used the marks from last nights mock-up session. After the holes were drilled and deburred I put them in the blast cabinet and cleaned them up for powder coating.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.