KitLog pro

Powered By Kitlog Pro v2.0

Bill's Glasair Odyssey
' style=
Date:  6-15-2011
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Counterweight arm mounting holes drilled

After the three ply layups had cured I put the ailerons back on. I fixtured them in the neutral position. I used a string to determine the neutral position per the Super GII instructions. I then put the counterweights back in and used the arms to pilot the drill to drill the 20 lb foam ribs.
' style=

Counter weight holes drilled

Counter weight holes drilled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.