Brief Description: Boot Cowl, Installed to check fit
Installed the boot cowl side and top panels to check the fit and to see how it looked screwed down tight. Everything checks out just fine - so I guess I can move on down the list. The tunnel underneath and Station B bulkhead have to be finish-drilled and have nutplates installed.