KitLog pro

Powered By Kitlog Pro v2.0

Brad Wilkinson, Bearhawk #1062
' style=
Date:  10-19-2008
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Installed Flap Handle, Started Cable

After getting the flap handle and quadrant worked out - I installed it on the airframe and started running the cable. I made the thimble eye in the flap handle end around a clevis, and then ran the cable under the pulleys to get an accurate length and cut it there.
' style=

Flap Handle Up

Flap Handle Up

' style=

Flap Handle Down

Flap Handle Down

' style=

Cable alignment with elevator control

Cable alignment with elevator control

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.