Brief Description: installed wing tanks, drilled holes in floorboards
9 people attended a session that lasted just over 2 hours.
both wing fuel tanks were installed using a weatherproof silicon to bond them in place (per the instructions) The landing gear was removed (and later temproarily replaced) in order to access brackets to drill holes through the floorboards for the control column attachment.
Terry and Bryan removing gear for access to drill floorboards
scuffing and cleaning spars for good attachment with wing fuel tanks
fitting drill bits to drill through floorboards (control column attachment points)