KitLog pro

Powered By Kitlog Pro v2.0

EAA Chapter 24 Kitfox
' style=
Date:  3-14-2018
Number of Hours:  11.00
Manual Reference:  
Brief Description:  Worked on rudder system, fuel system, wing lockers

Got back to work after about a two month hyatis for cold weather.

Eric and Art worked on covering the rudder ( 4 hours)

Terry worked on the brakes. Determined that we would be able to use the Matco brakes with the on board resevoir, if we can't the brake pedals toward the pilot slightly, and trim some of the bolt off the top of the brake cylinder. Both of these "modifications" to the brake were called for in the instructions. (2 hours)

Jay worked on general admin (cleaning up the shop spaces and planning the next couple of weeks activities) along with some work on fitting the plexiglass sides to the wing lockers. (2 hours)

Michael agreed to take the lead on the wingtip installation, and spent time with an inventory of available parts and familizrizing himself with the instructions. (1.5 hours)

Greg agreed to take the lead on the fuel system installation. He also did an inventory of the parts along with familiarize himself with the instructions as well as applicable service letters and bulletins (1.5 hoours)
' style=

Greg becoming familiar with the fuel system

Greg becoming familiar with the fuel system

' style=

Art and Eric working on covering the rudder

Art and Eric working on covering the rudder

' style=

More elevator covering work

More elevator covering work

' style=










Copyright © 2001-2020 Matronics. All Rights Reserved.