This is post 1 of 2 for the 29th of May. Today we started covering the wings! Progress included: Cutting and glueing in the fabric to the bottom of the left wing, installing the second pitot/static line through the rear spar. 9 people attended and worked for a total of 18 man hours.
Bryan and Eric E work on adjusting the flaperon pushrods
Eric and Bryan work on gluing the leading edge of the bottom left wing fabric
Getting the fabric ready for the bottom of the left wing.