KitLog pro

Powered By Kitlog Pro v2.0

EAA Chapter 24 Kitfox
' style=
Date:  4-18-2018
Number of Hours:  3.00
Manual Reference:  
Brief Description:  applied leading edge to port wing

Art, Jay, and Terry ( 1 hour each) attached the port leading edge per the plans. We used a 3M epoxy, clecos for proper positioning, and tape to apply clamping pressure while the glue cured.
' style=

syringes used for measuring epoxy by volume (3:2)

syringes used for measuring epoxy by volume (3:2)

' style=

Art applying epoxy to leading edge

Art applying epoxy to leading edge

' style=

Art and Terry applying tape for clamping pressure while clecos hold for positioning

Art and Terry applying tape for clamping pressure while clecos hold for positioning

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.