Powered By Kitlog Pro v2.0
EAA Chapter 24 Kitfox
IV
Fuselage
9-4-2019
< Previous Log Entry
Next Log Entry >
Date:
9-4-2019
Number of Hours:
6.00
Manual Reference:
Brief Description:
wing taping and ironing
Eric, Lawson, Bryan, Pete, Eric E., and Derek continue to work on taping on the left wing. Lawson worked on shrinking the fabric for the right wing.
Lawson heats the right wing fabric to 350 degrees for the final shrinking
Bryan laying down a 2 inch tape on the left wing near the wing root
Pete taking measurements and marking fabric for a gusset
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
IV Home
Category
# Logs
# Hours
All
98
870
Avionics
3
29
Control System
4
10
Empennage
1
6
Engine
3
33
Fuel System
2
36
Fuselage
17
155
Miscellaneous
17
164
Wings
51
437
Copyright © 2001-2024 Matronics. All Rights Reserved.