KitLog pro

Powered By Kitlog Pro v2.0

EAA Chapter 24 Kitfox
' style=
Date:  5-22-2019
Number of Hours:  30.00
Manual Reference:  
Brief Description:  pitot routing, fueltank rib bracing, nutplates fro

This entry covers the last three weeks. Several members attended including Eric S. Eric E., Jay, Derek, Bryan, Pete, Steve, and Hannah

More of the same with prepping the wings. Only real significant addition was the routing of the pitot line from the pitot probe area through the aft wing spar.
' style=

pitot tube routing.  Will finish off with some elbows before covering and route static line

pitot tube routing. Will finish off with some elbows before covering and route static line

' style=

bracing for rib that will be attached with epoxy to the bottom of the wing tank

bracing for rib that will be attached with epoxy to the bottom of the wing tank

' style=

Derek working in nutplates to hold on cowling.

Derek working in nutplates to hold on cowling.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.