Micheal and Eric were present. We worked on the wing lockers and Eric ironed down fabric tapes and worked on the wing tip mounts. Michael was there 1.5 hrs and Eric a little over 2. We plan to bond the wing locker side panels in both wings and the aluminum strips for mounting the wing tips next week.