5 people for approximately 2 1/2 hours. Work today was on installing the pitot/static tube in the left wing. We have fabricated a piece of alluminum to sandwich the plywood in the wing with the pitot static tube. We began shaping the backer piece and drilling and riveting on the nutplates that will accept the #6 screws. We got two of the holes completed. Next session we intend to finish the holes and then trim the backer plate to its final shape. We might also begin to loosely attach the pitot static lines and discuss how and when we want to affix them more permanantly.
Pete and Adam are thinking through the installation process
adam drilling the holes for the nutplate installation