Powered By Kitlog Pro v2.0
Mike and Elisabeth CH750 build
CH 750
Elevator
8-12-2011
< Previous Log Entry
Next Log Entry >
Date:
8-12-2011
Number of Hours:
2.00
Manual Reference:
Brief Description:
Trimmed Nose Skins, started re-install
Took Elevator nose skins to TA's hangar and he and I trimmed them with his metal sheer.
Back at our hangar I cleaned up the elevator getting rid of what was left of the old rivets.
Then I clecoed the skins back onto the elevator, and rivited the bottom of the left hand skin.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CH 750 Home
Category
# Logs
# Hours
All
49
109
Elevator
10
26
Fuselage
19
55
Horizontal Stabilize
7
16
Rudder
12
11
Wings
1
1
Copyright © 2001-2024 Matronics. All Rights Reserved.