KitLog pro

Powered By Kitlog Pro v2.0

Buck's RV-8
' style=
Date:  6-12-2009
Number of Hours:  1.30
Manual Reference:  
Brief Description:  Prime and paint aft deck

Prepped and primed the aft deck and the aft bulkhead. Painted the aft deck using the same "Ford Gray" color I used on the interior. The aft bulkhead will be painted much later, with the rest of the exterior of the plane.

I also painted the elevator stop and the F-810A upper aft bulkhead, and cleaned and prepped the two spacers that will go under the leading edge of the horizontal stabilizer spar.
' style=

Aft deck primed and painted.

Aft deck primed and painted.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.