KitLog pro

Powered By Kitlog Pro v2.0

Buck's RV-8
' style=
Date:  4-16-2008
Number of Hours:  1.30
Manual Reference:  
Brief Description:  Floorboards; interior painting prep

Tonight I installed the 14 additional floor platenuts in the floor sub-structure.

Next, I began preparation for painting the interior of the airplane by removing the remaining floorboards, the flap motor, and other miscellaneous items.

I also began figuring out the placement of some miscellaneous cockpt items such as the Carbon Monoxide detector and the ELT remote indicator. I originally thought I might mount them on the right mid-cabin cover, but that area looks like it will be handy to stash maps, charts, and such. The left cabin cover is a possibility, but it's pretty cluttered right now. I'll have to wait and see once I get my GRT EIS-400 unit and fuel valve installed. I might also place them on the instrument panel.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.