KitLog pro

Powered By Kitlog Pro v2.0

Buck's RV-8
' style=
Date:  10-8-2007
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Elevator pushrods; smoke system

Began fabricating the two elevator pushrods: Cut both pushrods to length and primed the interiors of both.

Cut out a 3/4" hole in the floor of the aft baggage compartment for the smoke oil line and power-supply wire(s) to pass through. Rounded the edges of the doubler plate, then prepped and primed the plate in preparation for painting. (Nice alliteration, eh?)
' style=

The forward and aft elevator bellcranks have been primed inside.

The forward and aft elevator bellcranks have been primed inside.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.