KitLog pro

Powered By Kitlog Pro v2.0

Buck's RV-8
' style=
Date:  10-3-2007
Number of Hours:  2.80
Manual Reference:  
Brief Description:  Smoke system; elevator bellcrank

After looking at the fuselage structure under the baggage compartment, and thinking about all the various ways I could install the smoke oil reservoir, I've decided to mount it dead-center in the baggage compartment. The support is best there, and the implications are least. There will still be plenty of room on either side of the reservoir (and on the back shelf) for tool bags, soft-sided luggage, lawn chairs, and whatnot.

I fabricated a doubler pate from 0.040 and drilled it to match the hole pattern already in the floorboard, then drilled it for four 1/4-20 platenuts -- the four points where the reservoir angles will attach to the floor. I also marked the doubler for the locations of the rivets that will attach it to the floor. (The doubler will be a permanent part of the floorboard, but the angles will be removable.) For reference, the size of the doubler is 11-1/8" x 15-1/8".

Switching gears, I decided to see how many rivets I could set on the new elevator bellcrank. The answer is six -- before I ran out of room to get the squeezer or a bucking bar in there. The nice folks at Van's said that either Cherry Max rivets or AN3 bolts with stop-washers would be fine for those last four holes.
' style=

The edges of the doubler plate are under the blue tape.

The edges of the doubler plate are under the blue tape.

' style=

The front 6 rivets are set; the other 4 will have to be blind rivets or bolts. Note the rogue rivet.

The front 6 rivets are set; the other 4 will have to be blind rivets or bolts. Note the rogue rivet.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.