It was over 60 degrees outside today, and the workshop was balmy! Weird!
I began by drilling the 7/16" gear bolt holes in the floorboards, using the gear tower weldment holes as a template.
The rest of the evening, I installed the platenuts under the left and right mid-cabin covers. (I miss having the fuselage on the rotisserie -- bending over to install the platenuts is back-breaking after a while.)
The first of five bolt holes that will be drilled in each gear tower weldment.
The right mid-cabin cover, attached with #8 screws.