KitLog pro

Powered By Kitlog Pro v2.0

Buck's RV-8
' style=
Date:  5-4-2007
Number of Hours:  2.80
Manual Reference:  
Brief Description:  Floorboard platenuts and gear towers

This evening I finished the access hole in the left gear tower by filing/sanding it to size. Next up will be drilling the holes out to full size for the screws, and installing the platenuts. (Tomorrow, maybe.)

Speaking of platenuts, I installed about 40 of them in the floor support angles. Only about 65 to go! There were several places where I used one-lug nuts because of the underlying structure, and a couple of other places where I'm still scratching my head about how I'll make it all work, but overall, I'm pleased with this whole floorboard project. I figure it'll take me about 30-35 hours of total effort to split the floorboards into multiple pieces and attach them entirely with screws and platenuts. Not a bad tradeoff for the great utility I'll get out of it.
' style=

Left gear tower access hole.

Left gear tower access hole.

' style=

I wouldn't think of doing the whole

I wouldn't think of doing the whole "removable floorboard" thing without a fuselage rotisserie.

' style=

Floorboard platenuts installed. There are about 100 of them, the way I'm doing it.

Floorboard platenuts installed. There are about 100 of them, the way I'm doing it.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.