KitLog pro

Powered By Kitlog Pro v2.0

Buck's RV-8
' style=
Date:  4-25-2007
Number of Hours:  3.40
Manual Reference:  
Brief Description:  Floorboards, foot wells

Drilled, deburred, sanded, dimpled, cleaned, primed and riveted R foot well.

Split F-830 and F-831 floorboards into two pieces each. Filed and polished edges. Began fabricating doublers (7-3/4" x 1") which will join each half together.

Laid out F-830 B/D/E/F stiffeners on the bottom sides of the floorboards.
' style=

The F-830 and F-831 floorboards, before being split.

The F-830 and F-831 floorboards, before being split.

' style=

I cut the skins using a Dremel tool with a carbide wheel.

I cut the skins using a Dremel tool with a carbide wheel.

' style=

Getting ready to backdrill the doubler/connector to the skin pieces. Skins are duct-taped together.

Getting ready to backdrill the doubler/connector to the skin pieces. Skins are duct-taped together.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.