KitLog pro

Powered By Kitlog Pro v2.0

Buck's RV-8
' style=
Date:  1-26-2011
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Wiring prep; brake lines

In preparation for wiring, I installed a few Adel clamps in strategic locations, including next to the lightening hole at the top of the right gear tower, and along a couple of longerons in the avionics "hell hole."
' style=

This Adel clamp will ease the transition for wires coming out of the top of the gear tower.

This Adel clamp will ease the transition for wires coming out of the top of the gear tower.

' style=

Four more clamps added near the bottom of the avionics hole.

Four more clamps added near the bottom of the avionics hole.

' style=

Right brake line is now permanently installed.

Right brake line is now permanently installed.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.