KitLog pro

Powered By Kitlog Pro v2.0

Buck's RV-8
' style=
Date:  11-4-2010
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Brake lines; wiring clamps; wiring

I decided to permanently install the right brake line today. (I'd already fabricated most of it long ago -- today, I cut the lower end to length, installed the fitting, and flared it.) I can't install the left brake line yet, because I still have to make and install two fuel lines through the bottom of the left gear tower first.

Next, I installed four or five Adel clamps along the cross-cockpit brace in preparation for running lots of wires later. Because of some possible interference with the harnesses that will come off the avionics hub mounted below, there's a possibility that I'll have to invert three or more of the clamps.

I also began twisting some 18AWG wire pairs for use in the fuselage.
' style=

Right brake line and wiring clamps. (The clamps might have to be inverted for clearance later.)

Right brake line and wiring clamps. (The clamps might have to be inverted for clearance later.)

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.