KitLog pro

Powered By Kitlog Pro v2.0

Buck's RV-8
' style=
Date:  7-2-2009
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Tail wiring

Today I received the 5-conductor wire for the elevator trim, so I bundled it with the others, taped the bundle to the pull-string already in the conduit and pulled them all through. I then fed the strobe and nav light wires through the grommets in the two aft bulkheads, and installed a hole edge grommet in one of the lightening holes in the horizontal stabilizer, where the trim wire will pass through. (It will also get wrapped with spiral-wrap in that area.)
' style=

The bundle of wires, ready to be pulled. The black plug is for the video camera.

The bundle of wires, ready to be pulled. The black plug is for the video camera.

' style=

Strobe and nav light wires.

Strobe and nav light wires.

' style=

Edge-grommet in lightening hole of horizontal stabilizer.

Edge-grommet in lightening hole of horizontal stabilizer.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.