Today I painted and assembled the shelf for the DVR power supply (see previous entry). It will be mounted in the airplane after most of the wiring is done under the aft baggage area.
Next, I installed four 1/4" nutplates on the avionics bulkhead and bolted on the two B&C alternator controllers.
Finally, I installed all nine nutplates for the upper right map pocket (seven in the fuselage structure seen below, and two in the vertical channel cap).
DVR power supply and custom mounting shelf.
Alternator controllers mounted to avionics bulkhead.