KitLog pro

Powered By Kitlog Pro v2.0

Buck's RV-8
' style=
Date:  1-24-2011
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Wing closing prep

In the next week, I plan to close the wings, so much of this evening's work centered around final preparations for that. I removed the bottom skins and spent some time examining everything inside, making sure all the flight controls and wiring runs were secured correctly. I added some zip ties to the wiring runs in several locations, and re-checked bolt torques. As I was doing a test-fit of the pitot tube in the left wing, the phenolic power connector simply deteriorated in my hands, so I'll have to order a replacement. (The pins inside are OK, it's just the outer shell that broke apart.)

I also improved the wingtip ground points for the landing lights, and temporarily removed a couple of Adel clamps holding wires to the tip ribs. These would have gotten in the way of the fixture I'll be using to hold the wings while the skins are riveted on.
' style=

I like to put a dot of torque-seal enamel on all fittings after they've been final-torqued.

I like to put a dot of torque-seal enamel on all fittings after they've been final-torqued.

' style=

Little details -- labeling and a few more zip ties.

Little details -- labeling and a few more zip ties.

' style=

The connector these pins used to be in? Now in about ten pieces...

The connector these pins used to be in? Now in about ten pieces...

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.